ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
OpenFlows, OpenRoads, PLAXIS, STAAD
Rajghat’s multivillage rural water supply scheme will provide irrigation and power generation to rural residents via a 7,890-kilometer pipe system, including 698 overhead tanks and ancillary pumps and equipment. Upon completion, the water network will provide access to clean drinking water for 2.5 million people. Varying soil properties and terrain presented hydraulic and structural design and analysis challenges amid a short project timeline. Initial software applications proved time-consuming and ineffective to meet the project schedule.Leveraging OpenFlows, PLAXIS, and STAAD, the project team completed engineering within four months, compared to 12 to 13 months using traditional methods. Working in an open digital environment saved 50% in modeling time, increasing productivity by 32 times. Bentley’s applications automated and optimized hydraulic, structural, and geotechnical design and analysis, reducing the foundation size and precisely fitting the treatment plant to minimize the carbon footprint to save 10% in construction time. The 3D models and data will be linked with monitoring devices for digital operations and maintenance.