ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
Bentley LumenRT, Cesium, iTwin, OpenBridge, OpenGround, OpenRoads, PLAXIS, ProjectWise, SYNCHRO
The Semarang–Demak Toll Road is Indonesia’s first toll road integrated with a sea embankment, designed to reduce flooding and improve transportation along the northern coast of Java. PT Wijaya Karya (WIKA) is leading a 6.7-kilometer section that includes embankments, bridges, sand reclamation, and toll infrastructure built over open seawater. The project faces significant challenges from severe land subsidence, soft seabed conditions, tidal fluctuations, and the need for real-time monitoring of construction activities in a dynamic marine environment.
Bentley’s integrated digital delivery environment connected geotechnical analysis, design, construction planning, and real-time monitoring across the project. The approach reduced displacement-event detection time from days to hours, cut unplanned infrastructure downtime by up to 50%, reduced RFIs by 25%, and improved early identification of field conflicts by 20%. As a result, the project will protect an estimated 254,546 people from chronic tidal flooding.