ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
GeoStudio, iTwin Capture, Leapfrog, PLAXIS
Spanning 50.14 kilometers across Papua, the Mamberamo-Elelim section of the Trans Papua roadway project serves as a critical connection corridor, reducing travel times from five or six hours to one hour and 20 minutes, bringing life-changing accessibility to one of Indonesia’s most isolated mountainous regions. Hutama Karya is leading the project and faced steep terrain, high rainfall, and erosion-prone slopes, limiting accessibility and subsurface data collection quality. To overcome geographical isolation, geotechnical uncertainty, and logistical complexities, Hutama Karya needed integrated geoengineering technology.
Hutama Karya leveraged Bentley iTwin Capture to generate a precise 3D reality terrain mesh, using Leapfrog, GeoStudio, and PLAXIS to perform geotechnical and subsurface modeling and analysis. This process provided visual and topographical insight to optimize design and save up to USD 1 million in costs. Bentley’s integrated applications facilitated comprehensive slope stability analysis and risk mitigation strategies, saving approximately USD 2.5 million in potential rework and reducing carbon emissions by 49,672 kilograms. The digital solution ensured accurate planning, efficient design, and sustainable delivery.