ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
OpenFlows, STAAD
As part of creating a dynamic and sustainable NPKL township, Bangalore Development Authority initiated an integrated area development project which included the scope of potable water supply, sewerage collection, and recycle water network through a piped system for 3,032 homes. L&T Construction is responsible for design, construction, commissioning, and operations and maintenance for 10 years. Faced with a constrained construction area and multiple disciplines working amid a tight schedule, L&T realized that conventional methods were time-consuming, delivered inaccurate results and were prone to rework in design and execution stages since the scope involves extensive house service connections and laying of multiple utilities in the same constrained area. Therefore, they needed an integrated hydraulic and structural modeling solution.Leveraging OpenFlows and STAAD, L&T modeled and analyzed multiple hydraulic operating scenarios in order to ensure that the sewer and water network is optimised and performed structural design & analysis for 125 different structures. Bentley’s integrated technology solution saved 40% in engineering resource hours, and assisted in completing the engineering works in six months compared to nine months using manual processes. Establishing collaborative digital workflows avoided clashes and minimized rework, improving productivity by 25%. Implementing digital monitoring systems will enable remote operations and maintenance functions for smart utility management.