ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
iTwin, iTwin Capture, LumenRT, OpenBuildings, Raceway and Cable Management, SYNCHRO
Xianning Chibi 500-kilovolt Substation is a key project in Hubei that will meet Xianning’s power load growth demand, optimizing the power grid to improve power supply reliability. The project presented complex topography, requiring a compact layout, compounded by a short construction period. Faced with coordinating multiple engineering disciplines, POWERCHINA realized that traditional workflows were insufficient to timely deliver the project within budget. Aiming to achieve full lifecycle digitization, they needed integrated 3D/4D modeling and digital twin technology.POWERCHINA selected Bentley’s 3D/4D modeling and iTwin applications to establish a collaborative digital design environment, 4D visual construction methodology, and a full 3D substation digital twin. The integrated technology solution reduced the project footprint by 0.97 hectares, minimizing farmland impact and saving CNY 2.84 million in costs. Working in a coordinated design and construction management platform, the team avoided more than 50 reworks, reducing the construction period by 30 days. The digital twin facilitates real-time asset insight and smart substation management, setting a benchmark for digitization of the State Grid.