Página inicial / Projetos / Process and power generation / Projeto de geração de energia para utilização abrangente de recursos de gás excedente de 2x65MW do Shandong Iron & Steel Group Co., Ltd, Filial de Laiwu

Projeto

Organization and Company name

Shandong Province Metallurgical Engineering Co., Ltd

Projeto de geração de energia para utilização abrangente de recursos de gás excedente de 2x65MW do Shandong Iron & Steel Group Co., Ltd, Filial de Laiwu

Crédito da imagem: Shandong Province Metallurgical Engineering Co., Ltd

Projeto

Organization and Company name

Shandong Province Metallurgical Engineering Co., Ltd

Projeto de geração de energia para utilização abrangente de recursos de gás excedente de 2x65MW do Shandong Iron & Steel Group Co., Ltd, Filial de Laiwu

Crédito da imagem: Shandong Province Metallurgical Engineering Co., Ltd
Categorias de prêmios

Process and power generation

Location

Jinan, Shandong, China

Bentley software used

AutoPIPE, Bentley Raceway and Cable Management, MicroStation, OpenBuildings, OpenPlant, OpenRoads Designer, ProjectWise, ProSteel, ProStructures

Resumo do Projeto

Shandong Iron & Steel Group decided to build a 2×65-megawatt surplus gas power generation facility. Shandong Province Metallurgical Engineering is responsible for design, construction, and trial operation. The project presented a small footprint and a complicated pipeline layout, as well as required digital delivery. They realized that continuing with their conventional 2D power generation design methods would not suffice, and that they needed to adopt 3D collaborative design processes.They used Bentley’s factory digital design applications to rationally arrange the massive piping system and maximize the use of vertical space. By accurately reducing the pipeline height and resolving clashes prior to construction, they improved design quality by 13%. Using ProjectWise as the collaborative management platform streamlined workflows and improved design productivity. Bentley’s integrated 3D digital solution enhanced overall design efficiency by 35% and reduced design costs by 18% compared to conventional 2D processes.

20% de desconto em software da Bentley

A oferta termina na sexta-feira

Use o código de cupom "THANKS24"

Comemore a excelência na gestão e no desempenho da infraestrutura

Year in Infrastructure e Going Digital Awards 2024

Indique um projeto para os prêmios de maior prestígio em infraestrutura! O prazo estendido para participar é 29 de abril.