主页 / 项目 / 能源输送和通信网络 / 输变电工程施工中 BIM 技术的综合应用

Project

Organization and Company name

国网衡水供电公司

输变电工程施工中 BIM 技术的综合应用

Image Credit: STATE GRID HENGSHUI ELECTRIC POWER SUPPLY COMPANY

Project

Organization and Company name

国网衡水供电公司

输变电工程施工中 BIM 技术的综合应用

Image Credit: STATE GRID HENGSHUI ELECTRIC POWER SUPPLY COMPANY
Award Category

能源输送和通信网络

地点

中国,河北省,衡水市

Bentley software used

MicroStation, SYNCHRO

Project summary

The Qinghan substation project was initiated to improve grid structure and strengthen power supply in Gucheng County, Hengshui. With more than 20 disciplines and suppliers located across eight provinces, the project was difficult to control amid a global pandemic, and presented additional challenges given the proximity to live power supply equipment and soft soil conditions. The project team wanted to explore BIM processes as a new mode of power grid construction and needed an integrated digital solution.Leveraging MicroStation and SYNCHRO, the team performed collaborative modeling, collision detection, and construction simulation, optimizing design and construction while saving a combined CNY 538,100. Working in a digital environment effectively resolved the insufficient soil bearing capacity and safety risks associated with the narrow construction space. Bentley’s comprehensive BIM solution reduced the construction period by 74 days and provided the basis for developing a digital twin of the power grid for full digital lifecycle operations and maintenance management.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.