主页 / 项目 / 施工 / 珠江三角洲超深输水隧道 BIM 技术应用

项目

Organization and Company name

CHINA RAILWAY 18TH BUREAU GROUP CO., LTD.

珠江三角洲超深输水隧道 BIM 技术应用

Image Credit: CHINA RAILWAY 18TH BUREAU GROUP CO., LTD.

项目

Organization and Company name

CHINA RAILWAY 18TH BUREAU GROUP CO., LTD.

珠江三角洲超深输水隧道 BIM 技术应用

Image Credit: CHINA RAILWAY 18TH BUREAU GROUP CO., LTD.
Award Category

施工

地点

中国,广东省,佛山市

Bentley software used

iTwin Capture、LumenRT、MicroStation、OpenBuildings、OpenRoads、PLAXIS、SYNCHRO

Project summary

The Pearl River Delta Water Resources Allocation project is the largest water conservancy investment ever made in Guangdong province. It will improve water supply security and capacity, as well as promote sustainable development in the region. China Railway 18th Bureau Group is responsible for the construction and execution of the ultra-deep, double-track water transmission tunnel, located 70 meters underground along a 113.2-kilometer transmission line. The project’s complex topography and geology presented numerous technical difficulties, coordination challenges, and safety risks, requiring the team to leverage an integrated BIM and GIS technology solution.China Railway selected Bentley’s BIM, reality modeling, and geotechnical analysis applications, along with SYNCHRO, to establish a connected data environment, create a full lifecycle digital management platform, and improve collaboration efficiencies by nearly 50%. Through digital workflows and construction simulations, they optimized construction planning and organization, reducing the construction period by 62 days and saving CNY 8.7 million. The integrated digital solution provides a foundation for similar projects and promotes smart water conservancy country wide.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.