主页 / 项目 / 施工 / 利用 Bentley 的集成数字化解决方案满足雅加达地铁 2A 期 CP203 的复杂需求

项目

Organization and Company name

PT Hutama Karya (Persero)

利用 Bentley 的集成数字化解决方案满足雅加达地铁 2A 期 CP203 的复杂需求

图片来源:PT Hutama Karya (Persero)

项目

Organization and Company name

PT Hutama Karya (Persero)

利用 Bentley 的集成数字化解决方案满足雅加达地铁 2A 期 CP203 的复杂需求

图片来源:PT Hutama Karya (Persero)
Award Category

施工

地点

印度尼西亚,雅加达,南雅加达

Bentley software used

Bentley LumenRT, iTwin, Leapfrog, PLAXIS, ProjectWise, SYNCHRO

Project summary

PT Hutama Karya (Hutama) is delivering Phase 2A of Jakarta’s MRT, involving construction of two main underground stations. Upon completion, the rail line will enhance citywide connectivity and mobility, integrating with Jakarta’s entire transportation network to reduce traffic congestion and carbon emissions by up to 35%. Located in a dense urban area, the project presented site constraints and complicated ground conditions, demanding meticulous planning and scheduling. To address these issues, Hutama needed a comprehensive, integrated digital solution.  Hutama selected Leapfrog and PLAXIS for geotechnical modeling and analysis, SYNCHRO for 4D planning and construction simulation, and ProjectWise and iTwin to establish a digital twin. Bentley’s geotechnical applications improved soil data collection and analysis by up to 95% and mitigated risks during excavation, saving up to USD 2.5 million. SYNCHRO 4D reduced heavy equipment use, promoting eco-friendly construction to save 50 tons of carbon emissions. Through real-time digital collaboration and data analysis, Hutama streamlined coordination and communication, slashing on-site operational inspection efforts by 90%.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.