主页 / 项目 / 能源输送和通信网络 / 获奖者 / Full Life Cycle Digital Applications of Butuo ±800kV Converter Station

获奖者

Organization and Company name

中国电力工程顾问集团西南电力设计院有限公司

Full Life Cycle Digital Applications of Butuo ±800kV Converter Station

图片来源:中国电力工程顾问集团西南电力设计院有限公司

获奖者

Organization and Company name

中国电力工程顾问集团西南电力设计院有限公司

Full Life Cycle Digital Applications of Butuo ±800kV Converter Station

图片来源:中国电力工程顾问集团西南电力设计院有限公司
Award Category

能源输送和通信网络

地点

中国,四川省,凉山州

Bentley software used

Bentley LumenRT, MicroStation, OpenBuildings, OpenSite, OpenUtilities Substation, ProjectWise, STAAD

Project summary

Butuo ±800-kilovolt Converter Station will transmit electric energy generated by the Baihetan Hydropower Station to the economically developed areas of eastern China. The clean energy delivered will meet annual electricity demands for 75 million people, reducing coal consumption by 27 million tons. With an aim to apply lifecycle digital workflows, the project team needed integrated technology to streamline workflows, control project costs, and achieve digital deliverables. Leveraging ProjectWise and Bentley Open applications, the team established a connected digital environment for collaborative multidiscipline design and construction management. Through 3D modeling and visual planning, they reduced total land used for the station by about 10 hectares to save CNY 45 million and reduce the project’s carbon footprint. Working in an integrated digital ecosystem reduced design time by 30 days, shortened the construction period by 40 days, and saved approximately CNY 7 million in overall project costs. The interoperability of Bentley’s applications helped save two days delivering the digital models for operations and maintenance.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.