主页 / 项目 / 能源输送和通信网络 / Full Lifecycle Digital Application On Xianning Chibi 500kV Substation Project 

获奖者

Organization and Company name

湖北省电力勘测设计院有限公司

Full Lifecycle Digital Application On Xianning Chibi 500kV Substation Project 

图片来源:湖北省电力勘测设计院有限公司

获奖者

Organization and Company name

湖北省电力勘测设计院有限公司

Full Lifecycle Digital Application On Xianning Chibi 500kV Substation Project 

图片来源:湖北省电力勘测设计院有限公司
Award Category

能源输送和通信网络

地点

中国,湖北省,咸宁市

Bentley software used

iTwin、iTwin Capture、LumenRT、OpenBuildings、Raceway and Cable Management、SYNCHRO

Project summary

Xianning Chibi 500-kilovolt Substation is a key project in Hubei that will meet Xianning’s power load growth demand, optimizing the power grid to improve power supply reliability. The project presented complex topography, requiring a compact layout, compounded by a short construction period. Faced with coordinating multiple engineering disciplines, POWERCHINA realized that traditional workflows were insufficient to timely deliver the project within budget. Aiming to achieve full lifecycle digitization, they needed integrated 3D/4D modeling and digital twin technology.POWERCHINA selected Bentley’s 3D/4D modeling and iTwin applications to establish a collaborative digital design environment, 4D visual construction methodology, and a full 3D substation digital twin. The integrated technology solution reduced the project footprint by 0.97 hectares, minimizing farmland impact and saving CNY 2.84 million in costs. Working in a coordinated design and construction management platform, the team avoided more than 50 reworks, reducing the construction period by 30 days. The digital twin facilitates real-time asset insight and smart substation management, setting a benchmark for digitization of the State Grid.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

庆祝卓越的基础设施交付和性能

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.