Project
Name der Organisation und des Unternehmens
Sinotech Engineering Consultants, Ltd.
Phase 2 des TPC Changhua Offshore-Windparkprojekts
Image Credit: Sinotech Engineering Consultants, Ltd.
Project
Name der Organisation und des Unternehmens
Sinotech Engineering Consultants, Ltd.
Phase 2 des TPC Changhua Offshore-Windparkprojekts
Image Credit: Sinotech Engineering Consultants, Ltd.
Auszeichnungskategorie
Hochbau und Statik
Standort
Landkreis Changhua, Taiwan
Eingesetzte Bentley-Software
OpenWindPower Fixed Foundation, SACS Pile Structure Design, SACS Wind Turbine Analysis Cloud Services
Projektübersicht
With a total power generation capacity of 300 megawatts, providing more than 1 billion units of electricity annually, the TPC Changhua Offshore Windfarm Phase 2 project will supply carbon-free electricity to approximately 270,000 households. Sinotech is designing the wind turbine generator support structures, requiring consideration of thousands of load scenarios. Faced with complicated geometry and voluminous data, they needed cloud-based, offshore structural design and analysis technology to complete the design in a timely manner.Sinotech selected SACS to perform 80,000 load simulations, generating petabytes of data. Bentley’s application provided a dynamic modeling and analysis environment to complete the simulations in one and a half months, compared to three and a half using conventional methods. The software’s automated and comprehensive computing features saved 60% in design time and approximately five petabytes of local storage space.