Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Image Credit: PowerChina ZhongNan Engineering Corporation Limited

Project.

Organization and Company name

PowerChina ZhongNan Engineering Corporation Limited

Application Of BIM Technology In The Lifecycle Of Wuqiangxi Hydroelectric Power Station Expansion Project

Image Credit: PowerChina ZhongNan Engineering Corporation Limited
Award Category

Process and power generation

Location

New York City, New York; Indianapolis, Indiana; and Dallas, Texas; United States

Bentley software used

AutoPIPE, AutoPLANT, Bentley Raceway and Cable Management, ContextCapture, iTwin.js, MicroStation, OpenBuildings, OpenBuildings Designer, OpenPlant, OpenRoads Designer, ProjectWise, SYNCHRO 4D

Project summary

To improve its hydraulic resources, the owner-operator of Wuqiangxi Hydropower Station will add 500 megawatts of installed capacity to its existing 1,200-megawatt capacity. The project presents complicated construction conditions, large engineering quantities, and a complex pipeline, compounded by the challenge of coordinating a multidiscipline team on a tight schedule. PowerChina ZhongNan provided engineering survey, design, and digital construction services. They realized that traditional manual design strategies were insufficient and needed integrated 3D BIM methodologies to achieve lifecycle digital plant management.PowerChina ZhongNan selected ContextCapture to generate a reality mesh. Bentley’s open 3D modeling applications, including OpenPlant, established a BIM design model and digital twin. Using ProjectWise, they seamlessly shared data and models among 13 disciplines. The applications helped decrease design time by two months while resolving over 70 design issues. The digital application provided visual management and control throughout construction, reducing costs by CNY 50 million.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.