Survey and design of China’s first pumped-storage power station in a complex karst area – Caiziba pumped-storage power station in Fengjie, Chongqing

Image Credit: Shanghai Investigation, Design & Research Institute Co., Ltd.
A black circle with a white "B" above the words "Finalist 2025," referencing YII 2025, on a white background with an orange bar at the top.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Project

Organization and Company name

Shanghai Investigation, Design & Research Institute Co., Ltd.

Survey and design of China’s first pumped-storage power station in a complex karst area – Caiziba pumped-storage power station in Fengjie, Chongqing

Image Credit: Shanghai Investigation, Design & Research Institute Co., Ltd.
Award Category

Energy production

Location

Fengjie County, Chongqing City, China

Bentley software used

Bentley Descartes, Bentley LumenRT, MicroStation, OpenPlant, PLAXIS, ProjectWise, STAAD, SYNCHRO

Project summary

The Caiziba pumped-storage power station is the first large-scale pumped storage project in China’s complex karst area. Located amid extensive karst formations, including caves and fissures, the project presented significant site challenges, compounded by technical and coordination issues. Previous traditional design and modeling applications resulted in data fragmentation and workflow bottlenecks. To address these shortcomings, the project team realized that they needed an integrated, dynamic technology solution.

Leveraging Bentley’s 3D modeling, digital twin, and construction simulation technology, the team established a collaborative digital platform and standardized component library, streamlining workflows and achieving dynamic coupling of geological modeling and construction. Working in a coordinated design environment eliminated 1,850 conflicts to avoid rework costs of approximately CNY 4.5 million. The integrated digital twin solution shortened the construction period by 42 days and optimized steel and concrete usage, reducing carbon emissions by 11,110 tons to deliver intelligent green infrastructure that supports regional clean energy transformation.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.