Home / Projects / Process and power generation / Converter-Based Continuous Casting Project of Jinnan Steel Phase II Quwo Base Capacity Reduction & Replacement Project

Winner

Organization and Company name

WISDRI Engineering & Research Incorporation Limited

Converter-Based Continuous Casting Project of Jinnan Steel Phase II Quwo Base Capacity Reduction & Replacement Project

Image Credit: WISDRI Engineering & Research Incorporation Limited

Winner

Organization and Company name

WISDRI Engineering & Research Incorporation Limited

Converter-Based Continuous Casting Project of Jinnan Steel Phase II Quwo Base Capacity Reduction & Replacement Project

Image Credit: WISDRI Engineering & Research Incorporation Limited
Award Category

Process and power generation

Location

Quwo, Shanxi, China

Bentley software used

AutoPIPE, Bentley Raceway and Cable Management, OpenBuildings, OpenPlant, ProjectWise, ProStructures, SYNCHRO 4D

Project summary

Jinnan Steel Group invested in the Quwo Group (a merger of two steel production plants) to optimize the plant’s industrial layout and achieve higher production quality, efficiency, and sustainability. As the general contractor, WISDRI faced technical and coordination challenges, compounded by limited space and a tight schedule amid COVID-19. They sought to streamline workflows and identify risks in advance through collaborative design and construction simulation technology.They selected ProjectWise and Bentley’s open modeling applications to digitally unify design among 16 different disciplines, reducing ambiguity and improving design quality. By performing collision detection, they eliminated 66 clashes, saving approximately CNY 1.7 million and reducing rework. Through construction simulation in SYNCHRO 4D, they cut construction by over 30 days and saved an additional CNY 3 million. The integrated digital approach minimized the impact of the pandemic and facilitated the development of a green, smart steel plant, promoting sustainable economic growth.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.