Home / Projects / Roads and highways / Ecological highway from Detian Transnational Waterfall to Shuolong border

Project

Organization and Company name

PowerChina ZhongNan Engineering Corporation Ltd.

Ecological highway from Detian Transnational Waterfall to Shuolong border

Image Credit: PowerChina ZhongNan Engineering Corporation Ltd.
White badge with an orange top border features a circular "B" icon and the text "Finalist 2025" in white—perfect for highlighting standout 2025 projects or YII 2025 achievements.
An orange and white graphic displays the text "Finalist 2025" in large white letters, celebrating standout 2025 projects featured in the Single Project Template.

Project

Organization and Company name

PowerChina ZhongNan Engineering Corporation Ltd.

Ecological highway from Detian Transnational Waterfall to Shuolong border

Image Credit: PowerChina ZhongNan Engineering Corporation Ltd.
Award Category

Roads and highways

Location

Chongzuo City, Guangxi Autonomous Region, China

Bentley software used

Bentley LumenRT, iTwin Capture, MicroStation, OpenRoads, ProjectWise, ProStructures, Other (ConceptStation)

Project summary

Located on the border between China and Vietnam, this 13.5-kilometer highway serves the Detian Transnational Waterfall scenic spot, improving travel conditions and promoting tourism. Passing through mountainous terrain, dense, urban residential areas, and scenic spaces, the project presented complex terrain and landscape protection challenges. To address these issues and coordinate multiple project participants, the team needed an integrated digital modeling solution to streamline design and construction management.

Leveraging Bentley ProjectWise to establish a connected data environment and Bentley OpenRoads to develop their BIM highway design system, the team standardized and automated 3D design workflows, improving collaboration by 60% and resolving 37 potential design conflicts. Integrating Bentley LumenRT to visually communicate design intent reduced communication costs by 30% and minimized construction risks. Working in an open digital modeling platform reduced design changes and optimized coordination and management to save an estimated CNY 6 million. The digital solution protected landscapes and the ecological environment, and reduced carbon emissions by 37.2 tons.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.