Home / Projects / Structural engineering / Fairmont Udaipur Palace

Project

Organization and Company name

AVS Engineers | ISID Architect
Nikhil Mahashur and Associates
Structural Engineer - Siddharth Sharma (AVS Engineers | ISID)

Fairmont Udaipur Palace

Image Credit: AVS Engineers | ISID Architect – Nikhil Mahashur and Associates, Structural Engineer – Siddharth Sharma (AVS Engineers | ISID)
A black circle with a white "B" above the words "Finalist 2025," referencing YII 2025, on a white background with an orange bar at the top.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Project

Organization and Company name

AVS Engineers | ISID Architect
Nikhil Mahashur and Associates
Structural Engineer - Siddharth Sharma (AVS Engineers | ISID)

Fairmont Udaipur Palace

Image Credit: AVS Engineers | ISID Architect – Nikhil Mahashur and Associates, Structural Engineer – Siddharth Sharma (AVS Engineers | ISID)
Award Category

Structural engineering

Location

Udaipur, Rajasthan, India

Bentley software used

RAM, STAAD

Project summary

Located in Udaipur, Rajashthan, the Fairmont property is a 500,000-square-foot luxury hotel set to become a landmark destination that boosts the local economy and preserves cultural identity. The complex terrain and architectural aesthetics presented structural challenges, requiring adaptive multilevel design, advanced retaining structures, and seismic compliance. To address these challenges and coordinate the multiple stakeholders, the project team realized that they needed an integrated and advanced structural modeling and analysis solution.

Leveraging Bentley RAM and STAAD, the team established a connected digital environment to model the various structural components and simulate the effects of wind and seismic activity amid terrain-based irregularities, optimizing structural integrity and material usage while adhering to the demanding architectural vision. The digital solution compressed the design schedule by four months, as well as saved 420 metric tons of steel and 2,400 cubic meters of concrete, reducing carbon emissions by 800 metric tons. By combining technical innovation, heritage sensitivity, environmental stewardship, and stakeholder collaboration, the project sets a new benchmark for responsible and efficient luxury development.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.