Home / Projects / Water and wastewater / Modeling and optimization of the Medellín Aqueduct primary network

Project

Organization and Company name

Empresas Públicas de Medellín EPM

Modeling and optimization of the Medellín Aqueduct primary network

Image Credit: Empresas Públicas de Medellín EPM
White badge with an orange top border features a circular "B" icon and the text "Finalist 2025" in white—perfect for highlighting standout 2025 projects or YII 2025 achievements.
An orange and white graphic displays the text "Finalist 2025" in large white letters, celebrating standout 2025 projects featured in the Single Project Template.

Project

Organization and Company name

Empresas Públicas de Medellín EPM

Modeling and optimization of the Medellín Aqueduct primary network

Image Credit: Empresas Públicas de Medellín EPM
Award Category

Water and wastewater

Location

Medellín, Antioquia, Colombia

Bentley software used

OpenFlows

Project summary

Aiming to improve water supply to 1.4 million families in Medellín’s metropolitan area, public services company EPM was tasked with modeling the city’s primary aqueduct network to digitally evaluate the system and view potential solutions for guaranteeing water access for the next 30 years. Faced with developing a model comprised of five water treatment plants located in mountainous terrain, EPM’s initial fragmented approach lacked integrated simulation and scenario assessment features, limiting predictive capabilities and cost analysis. To address these issues, EPM needed comprehensive hydraulic modeling and simulation technology.

Leveraging OpenFlows to model the network, EPM performed predictive analysis, calculated pumping costs, and simulated hierarchal scenarios. Compared to one month of previous manual analysis work, the integrated hydraulic model facilitated a detailed network evaluation in just a few hours. The digital twin enables EPM to identify smart solutions that optimize network operations. Working in Bentley’s digitally simulated environment has already saved 117 tons of annual carbon emissions and nearly USD 18.6 million in total costs.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.