Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Image Credit: CSCEC AECOM Consultants Co., Ltd.
A black circle with a white "B" above the words "Finalist 2025," referencing YII 2025, on a white background with an orange bar at the top.
A badge with an orange top border displays the text "Finalist YII 2025" on a white background, highlighting recognition for outstanding 2025 projects.

Project

Organization and Company name

CSCEC AECOM Consultants Co., Ltd.

Numerical simulation and analysis of urban flood control and drainage capacity in Northwest China based on digital technology

Image Credit: CSCEC AECOM Consultants Co., Ltd.
Award Category

Water and wastewater

Location

Jinchang City, Gansu Province, China

Bentley software used

Bentley LumenRT, MicroStation, OpenFlows, OpenRoads

Project summary

Led by CSCEC AECOM, this project aims to diagnose urban drainage system issues through 3D modeling and digital analysis, ensuring flood resilience under extreme rainfall to protect 300,000 residents in China’s Jinchuan district. Faced with aging infrastructure, missing data, complex underground utilities, and coordinating a multidiscipline team, CSCEC’s traditional 2D design approach failed to adequately meet the project’s modeling, analysis, and collaboration requirements. They needed an integrated, comprehensive, and collaborative hydraulic technology solution.

Leveraging Bentley OpenFlows and OpenRoads with 3D reality modeling applications, CSCEC established an open, connected data environment and digital twin. Using the model to perform hydrodynamic simulations, they optimized drainage system design, reducing design errors by 90% and piping material waste by 15%. Working in a collaborative platform shortened the construction period by 40%. The digital solution reduced carbon emissions by 500 tons and eliminated flood risk of 1,146 hectares. The project establishes a replicable digital benchmark for urban flood control in Northwest China.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.