Home / Projects / Energy production / Refuse-derived fuel (RDF) Jakarta – pioneering sustainable waste to energy solution

Project

Organization and Company name

PT Wijaya Karya (Persero) Tbk

Refuse-derived fuel (RDF) Jakarta – pioneering sustainable waste to energy solution

Image Credit: PT Wijaya Karya (Persero) Tbk
A white background with an orange bar at the top, a black circle with the letter B, and the text "Finalist 2025" below, perfect for showcasing YII 2025 or other standout 2025 projects in your Single Project Template.
A white rectangle with an orange top bar displays the text "Finalist 2025" in large, bold black letters, highlighting recognition among top YII 2025 projects.

Project

Organization and Company name

PT Wijaya Karya (Persero) Tbk

Refuse-derived fuel (RDF) Jakarta – pioneering sustainable waste to energy solution

Image Credit: PT Wijaya Karya (Persero) Tbk
Award Category

Energy production

Location

Jakarta, North Jakarta, Indonesia

Bentley software used

AutoPIPE, Cesium, iTwin Capture, iTwin IoT, MicroStation, OpenPlant, ProjectWise, ProStructures, STAAD, SYNCHRO

Project summary

Capable of processing up to 2,500 tons of daily municipal solid waste, the RDF Jakarta Plant directly addresses the city’s critical waste management crisis, mitigating landfill overuse, generating sustainable alternative fuels, and reducing annual carbon emissions by 100,000 tons. PT Wijaya Karya is delivering the project and faced complex data and workflow integration challenges, compounded by site, budget, and schedule constraints. PT Wijaya Karya needed to transition from fragmented manual workflows to an integrated digital design, construction, and cost management approach.

PT Wijaya Karya selected Bentley ProjectWise, iTwin Capture, iTwin IoT, and SYNCHRO to establish a connected digital ecosystem, enabling real-time 3D modeling, 4D construction sequencing, and 5D cost management. Integrating collaborative modeling, digital twins, and visual construction planning accelerated workflows by 30% to commission the project within 10 months while reducing overall costs by 15%. The digital strategy sets an industry benchmark, driving economic gains and environmental and societal sustainability beyond conventional project delivery methods.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.