Home / Projects / Process and power generation / The 2x65MW Surplus Gas Resources Comprehensive Utilization Power Generation Project Of Shandong Iron And Steel Group Co., Ltd Laiwu Branch

Project.

Organization and Company name

Shandong Province Metallurgical Engineering Co., Ltd

The 2x65MW Surplus Gas Resources Comprehensive Utilization Power Generation Project Of Shandong Iron And Steel Group Co., Ltd Laiwu Branch

Image Credit: Shandong Province Metallurgical Engineering Co., Ltd

Project.

Organization and Company name

Shandong Province Metallurgical Engineering Co., Ltd

The 2x65MW Surplus Gas Resources Comprehensive Utilization Power Generation Project Of Shandong Iron And Steel Group Co., Ltd Laiwu Branch

Image Credit: Shandong Province Metallurgical Engineering Co., Ltd
Award Category

Process and power generation

Location

New York City, New York; Indianapolis, Indiana; and Dallas, Texas; United States

Bentley software used

AutoPIPE, Bentley Raceway and Cable Management, MicroStation, OpenBuildings, OpenPlant, OpenRoads Designer, ProjectWise, ProSteel, ProStructures

Project summary

Shandong Iron & Steel Group decided to build a 2×65-megawatt surplus gas power generation facility. Shandong Province Metallurgical Engineering is responsible for design, construction, and trial operation. The project presented a small footprint and a complicated pipeline layout, as well as required digital delivery. They realized that continuing with their conventional 2D power generation design methods would not suffice, and that they needed to adopt 3D collaborative design processes.They used Bentley’s factory digital design applications to rationally arrange the massive piping system and maximize the use of vertical space. By accurately reducing the pipeline height and resolving clashes prior to construction, they improved design quality by 13%. Using ProjectWise as the collaborative management platform streamlined workflows and improved design productivity. Bentley’s integrated 3D digital solution enhanced overall design efficiency by 35% and reduced design costs by 18% compared to conventional 2D processes.

20% Off Bentley Software

Deal Ends Friday

Use Coupon Code "THANKS24"

Celebrate Infrastructure Delivery & Performance Excellence

The 2024 Year in Infrastructure and Going Digital Awards

Nominate a project for the most prestigious awards in infrastructure! Extended deadline to enter is April 29th.