ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
iTwin Capture, LumenRT, MicroStation, OpenFlows, OpenRoads, Pointools
The Montrose Interchange project was initiated to replace an existing at-grade T-junction on the N4 highway, improving traffic mobility, safety, and the Mbombela province’s economy and tourism. Positioned between two rivers amid steep valleys between mountains, the project presented difficult terrain for implementing the new high-standard, free-flow interchange on a short timeline with no available survey data. Bidding for the contract, SMEC realized that their traditional, manual 2D strategies would not suffice to meet the project challenges and requirements to use much of the existing infrastructure.SMEC selected ContextCapture to develop a reality mesh of the existing terrain and infrastructure and LumenRT to present their conceptual design, winning the design contract and delivering a workable design in record time. OpenRoads Designer facilitated integration with the bridge team’s modeling software while corridor modeling tools enabled accurate earthworks and material quantities calculations, reducing the carbon footprint of the project. Working in a collaborative digital environment saved approximately 2,500 hours in design time and an estimated ZAR 2.5 million in design costs.