ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
Bentley LumenRT, iTwin, iTwin Capture, MicroStation, OpenBridge, OpenRoads, ProjectWise, ProStructures
The Phnom Penh-Bavet Expressway is the second expressway in Cambodia, stretching 138 kilometers and passing through three provinces. China Road and Bridge Corporation (CRBC) was tasked with constructing the expressway that would shorten travel times from two hours to 20 minutes. However, the project was located in a floodplain, with water reaching a maximum of six meters during the rainy season. The team also needed to work around Buddhist temples and culture relics. Therefore, the team chose to implement digital delivery workflows. CRBC established an open connected data environment using the iTwin Platform, ensuring that the team could always access the most up-to-date information at anytime and any location. MicroStation, OpenRoads, and OpenBridge helped develop models that could be shared with stakeholders. By using Bentley applications, everyone on the project worked together in a unified environment, shortening the design cycle by 20%. The terrain and geological models optimized vertical alignment, reducing earthwork volume by 2 million cubic meters and the equivalent of 2.75 million tons of carbon emissions by eliminating truck travel.