ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
ATTEND AND PARTICIPATE
2026 EVENT PREVIEW
Projects
See all of this year’s entries
Sessions
Preview keynotes & industry talks
Speakers
Meet the experts & innovators
PAST PROJECTS
Awards & recognition
2025 winners
First-place award recipients
2026 finalists
Shortlisted top contenders
2025 Founders’ Honors
Projects that inspire us
About YII
Experience YII
Past Projects
Back
INSIDE the awards
About
Event yearbooks
Event news and updates
Bentley Labs
LATEST NEWS
2025 winners
2024 Yearbook
Back
attend and participate
Back
past projects
Awards & recognition
2025 winners
2026 finalists
2025 Founders’ Honors
LATEST NEWS
Blog article highlight
2026 categories
2024 Yearbook
AWARD CATEGORY
iTwin, GeoStudio, Leapfrog, OpenRoads, PLAXIS
The IKN Toll Road connects Balikpapan to Indonesia’s new national capital Nusantara, which is aimed to become the world’s most sustainable city through innovation, technology, and a green economy. PT Hutama Karya is the lead contractor for the 13.4-kilometer section 3A, including a 920-meter bridge across a river with a high water level. With a project area covering 109.49 hectares of steep terrain and dense forest, Hutama faced challenging topography amid a tight construction schedule and strict environmental requirements.Hutama selected iTwin Capture Modeler to process aerial-captured data into an accurate reality mesh of the entire site, accelerating data processing time by seven days. Requiring comprehensive modeling and geotechnical analysis technology, Hutama used Leapfrog Works, PLAXIS, and GeoStudio to perform 3D geotechnical modeling and analysis, resulting in over USD 90 million saved in potential rework. The integrated digital solution accelerated construction, enabling timely project completion while reducing carbon emissions by 83% during the construction period. The technology provides real-time monitoring of land clearing progress to minimize tree felling and meet crucial environmental requirements of the project.